Ordering a Chain When the Parts Book and the Old Link Count Disagree
Practical reading for undercarriage components, operating conditions and parts decisions.
On this page
If the parts book and the old chain disagree on link count, hold the purchase order until both counts are tied to the same definition and the same machine configuration. The book can refer to the original track arrangement, while the fitted chain reflects later repairs or a different configuration. A counting disagreement on its own does not tell you which chain to order.
Check what each number is counting
Copy the exact wording of the catalog entry and the quotation into the order notes. Ask the supplier whether the stated quantity refers to the complete chain assembly, the chain before closure or a delivery quantity. Record what the technician counted and where the count started. If the OEM uses a specific convention for the master joint, use that convention throughout. Request records from a qualified technician when a safe inspection cannot be made under the model’s service instructions.
| Evidence | Record | Question to resolve |
|---|---|---|
| Serial-number parts book | Edition, serial range and group number | Which undercarriage option does this entry apply to? |
| Fitted chain | Side, observed count convention and identifiable marks | Does this match a known previous replacement? |
| Supplier quote | Assembly number, pitch, count convention and delivery contents | Does it explicitly match the approved parts reference? |
Escalate conflicts that survive the recount
Suppose two records say 45 and 46 under the same convention. Those are illustrative numbers. Do not choose whichever is closer to the old part description. Check whether the machine has a different track-frame arrangement, whether the entry is for the other configuration, and whether the quote identifies the same chain family. Request confirmation of the mating sprocket and the required assembly from the serial-number parts source or an authorized parts specialist.
Put the decision on the purchase line
After the discrepancy is resolved, record the confirmed side, equipment serial number, assembly reference, count convention and count, pitch, and which joint components are included. Attach the written confirmation. Receiving can then compare the delivery with the approved order rather than reopening the conflict using only a pallet label.
References and related parts
See Caterpillar’s published small-dozer parts reference for supporting documentation. Browse the related KTSU parts collection after confirming the required configuration.
For the broader component decisions, use the steel track chain selection guide.
More Technical Guides guides
Find the next article for your component, application or buying decision.
Back to Technical Guides


