One Roller Was Replaced: Where Should the Next Wear Readings Be Taken?

Inspection, wear evidence and replacement planning for the complete track system.

KTSU2 min read
KTSU Maintenance & Wear illustration
KTSU topic illustration.

At the next inspection after a single bottom roller is replaced, recheck the replacement, the two adjacent positions where available, and the corresponding positions on the other side. Start from a recorded baseline taken at installation. This tells you whether the difference is simply the result of putting a new part next to worn ones or whether one location is changing faster than its neighbors.

Give every position a stable name

Use a numbering direction that survives a workshop handover. Record which end is the reference and attach a side-view sketch. On a machine with a different arrangement from the sketch, use the model-specific service diagram instead of transferring position numbers from another unit. The opposite side is a comparison, not an acceptance standard. Its own replacement history and operating pattern can differ.

Post-replacement measurement map
Location Record at installation Recheck against
Replacement position Part identifier, documented measurement surface, tool and reading Its own installation baseline
Adjacent positions Same fields, including whether the old parts were retained Each position’s own baseline and the change at the new roller
Matching positions across the frame Part configuration, prior work and equivalent measurement point Equivalent positions on this machine, with work history noted

Compare change, not just the reading

In a hypothetical example, a replacement position changes by 0.4 mm in 200 operating hours, while its neighbor changes by 0.1 mm over the same interval. If the method can reliably distinguish that difference, it is a reason to recheck the location and the work record. It is not a discard limit or proof that the new roller is defective. Use the applicable wear chart, measurement method and inspection interval for the serial-number range.

Leave a record another technician can repeat

Attach the photo showing the measurement point, tool identifier, hour meter and applicable service reference. Note any guard work, track adjustment, debris packing or inspection access change. If a position cannot be safely reached using the manufacturer’s procedure, mark it as not measured. A blank reading and a zero are different. Compare subsequent readings only after confirming that the same dimension and preparation method were used.

References and related parts

See Komatsu’s undercarriage maintenance guidance for supporting documentation. Browse the related KTSU parts collection after confirming the required configuration.

For the broader component decisions, use the excavator track roller selection guide.

Continue exploring

More Maintenance & Wear guides

Find the next article for your component, application or buying decision.

Back to Maintenance & Wear